Project Type |
RoR |
PRoR |
PROJECT LOCATION |
|
Location |
|
|
Region |
: |
Eastern |
Eastern |
|
Province No. |
: |
One |
One |
|
District |
: |
Solukhumbu |
Solukhumbu |
|
Rural Municipality |
: |
Chheskam VDC (Now, Mahakulung Rural Municipality) |
Chheskam VDC (Now, Mahakulung Rural Municipality) |
Project Boundary |
|
|
East |
: |
86°52’53″E |
86°52’53″E |
|
West |
: |
86°54’31″E |
86°54’31″E |
|
South |
: |
27°32’08″N |
27°32’08″N |
|
North |
: |
27°34’40″N |
27°34’40″N |
GENEARL |
|
River |
: |
Hongu |
Hongu |
Nearest Town |
: |
Salleri |
Salleri |
Type of Scheme |
: |
Run-of-River |
Peaking Run-of-River |
Highest Regulated Water Level |
: |
|
1966 masl |
Lowest Regulated Water Level |
: |
|
1961 masl |
Peaking Period |
: |
|
1-hour morning and 1-hour evening |
Reservoir Volume |
: |
|
46,442 m3 |
Dead Storage Volume |
: |
|
10,600 m3 |
Live Storage Volume |
: |
|
32,000 m3 |
Gross Head |
: |
310 m |
314 m |
Rated Net Head |
: |
294 m |
294 m |
HYDROLOGY |
|
Catchment Area |
: |
321.5 km2 |
321.5 km2 |
Design Discharge |
: |
11.71 m3/s |
11.71 m3/s |
Minimum Downstream Release |
: |
0.397 m3/s |
0.397 m3/s |
POWER AND ENERGY CALCULATIONS |
|
Installed Capacity (MW) |
: |
28.9 MW |
28.9 MW |
Total Saleable Energy |
: |
167.43 GWh |
167.43 GWh |
|
Dry Energy |
: |
31.49 GWh |
51.85 GWh |
|
Wet Energy |
: |
135.94 GWh |
115.58 GWh |
DIVERSION TUNNEL |
|
Type |
|
: |
Unlined |
Unlined |
Length |
|
: |
84 m |
84 m |
Size (B x H) |
|
: |
3 m x 3 m |
3 m x 3 m |
Slope |
: |
0.097 |
0.097 |
DIVERSION WEIR |
|
Type |
: |
Ogee shaped Concrete Gravity Dam |
Ogee shaped Concrete Gravity Dam with free overflow spillway |
Dam Length |
: |
15.2 m |
20.2 m |
Dam Height (from river bed) |
: |
7.0 m |
13.0 m |
UNDERSLUICE |
|
Size (B x H) |
: |
5 m x 2.5 m |
5 m x 3 m |
No. of Gates |
: |
1 |
2 |
INTAKE |
|
Type |
: |
Side Intake with submerged orifice |
Side Intake with submerged orifice |
Size of Intake Opening (B x H) |
: |
4.0 m x 2.4 m |
4.0 m x 2.4 m |
No. of Openings |
: |
2 |
2 |
Velocity of Flow at Intake Trash-rack |
: |
0.6 m/s |
0.6 m/s |
Trash-rack Cleaner |
: |
Manual by raking |
Manual by raking |
GRAVEL TRAP |
|
Average Length |
: |
7.6 m |
7.6 m |
Size (B x H) |
: |
2.7 x 3.0 m |
2.7 x 3.0 m |
GRAVEL TRAP FLUSHING CULVERT |
|
Length |
: |
13.0 m |
13.0 m |
Size (B x H) |
: |
1.3 x 1.3 m |
1.3 x 1.3 m |
APPROCH TUNNEL |
|
|
|
Type |
: |
Inverted D-shaped unlined and partially concrete lined tunnel |
Inverted D-shaped unlined and partially concrete lined tunnel |
Depth |
: |
3.5 m |
3.5 m |
Width |
: |
3.5 m |
3.5 m |
Bed Slope |
: |
1 in 200 |
1 in 200 |
Length |
: |
255 m |
255 m |
BRANCH TUNNEL (TO SETTLING BASIN) |
|
Type |
: |
Inverted D Shaped Concrete Lined |
Inverted D Shaped Concrete Lined |
Length |
: |
92 m (46 m each) |
92 m (46 m each) |
Size |
: |
2.5 m x 2.5 m |
2.5 m x 2.5 m |
SETTLING BASIN |
|
Type |
: |
Hopper shaped underground with mechanized flushing |
Hopper shaped underground with mechanized flushing |
Sediment Size to be Settled |
: |
90% of 0.2 mm |
90% of 0.2 mm |
No. of Bays |
: |
2 |
2 |
Length |
: |
100 m |
100 m |
Width of uniform section |
: |
8.0 m |
8.0 m |
Depth of uniform section (spring line to hopper top) |
: |
5.7 m |
5.7 m |
Depth of hopper |
: |
2.2 m |
2.2 m |
LINK TUNNEL (SETTLING BASIN TO HRT) |
|
Type |
: |
Inverted D Shaped Concrete Lined |
Inverted D Shaped Concrete Lined |
Length |
: |
82 m (41 m each) |
91 m (45.5 m each) |
Size |
: |
2.5 m x 2.5 m |
2.5 m x 2.5 m |
ADIT/ACCESS/FLUSHING TUNNEL |
|
Total Length |
: |
417 m |
487m |
Size |
: |
Various |
Various |
HEADRACE TUNNEL |
|
Type |
: |
Low Pressure Tunnel |
Low Pressure Tunnel |
Total Length (starting from link tunnel) |
: |
2 890 m |
2 890 m |
Excavated size of Tunnel (B x H) |
: |
3.5 m x 3.5 m |
3.5 m x 3.5 m |
Shape |
: |
Inverted D-shaped |
Inverted D-shaped |
SURGE SHAFT |
|
Type |
: |
Simple, Vertical Shaft Underground, RCC Lined |
Restricted Orifice Type or Steel Pipe |
Finished Diameter |
: |
6.0 m |
6.0 m |
Upsurge Level |
: |
1 968.7 masl |
1 974.7 masl |
Down-surge Level |
: |
1 947.3 masl |
1 947.3 masl |
Top of surge shaft |
: |
1 985.0 masl |
1 979.0 masl |
Total Height |
: |
45 m |
36.5 m |
HEADRACE PIPE |
|
Material |
: |
|
MS Pipe |
Length (including embedded in HRT) |
: |
|
245 m |
Diameter |
: |
|
2.5 m |
PENSTOK PIPE |
|
Surface Pipe |
: |
662 m length, 2.0 m dia. |
570 m length, 2.0 m dia. |
Diameter of penstock |
: |
2 000 mm before branching |
2 000 mm before branching |
Vertical Shaft with penstock |
: |
141 m length, excavated dia 3.2 m. |
141 m length, excavated dia 3.2 m. |
Inclined Shaft with penstock |
: |
167 m length, excavated width 3.0 m |
167 m length, excavated width 3.0 m |
Penstock on Surface |
: |
22 m length |
22 m length |
Branch pipe |
: |
77 m (dia 1.3 m and 0.9 m) |
77 m (dia 1.3 m and 0.9 m) |
Thickness |
: |
8 mm to 30 mm |
8 mm to 30 mm |
Material |
: |
Mild steel |
Mild steel |
POWERHOSUE |
|
Type |
: |
Semi-surface |
Semi-surface |
Size (L x B x H) |
: |
38 m x 17 m x 17 m |
38 m x 17 m x 17 m |
TAILRACE CULVERT |
|
Type |
: |
RCC box culvert |
RCC box culvert |
Length |
: |
25 m |
25 m |
Size (B x H) |
: |
varies |
varies |
TURBINE |
|
Type |
: |
Pelton, 4 jets |
Pelton, 4 jets |
No. of Units |
: |
2 |
2 |
Rated output |
: |
15 000 kW |
15 000 kW |
Max. Efficiency |
: |
90.50% |
90.50% |
Speed |
: |
428.6 RPM |
428.6 RPM |
GENERATOR |
|
No. of Units |
: |
2 |
2 |
Efficiency |
: |
98% |
98% |
Generation voltage |
: |
11 kV |
11 kV |
Rated output |
: |
18 MVA |
18 MVA |
Frequency |
: |
50 Hz |
50 Hz |
Transformer |
|
|
|
No. of Units |
: |
3 +1 spares |
3 +1 spares |
Efficiency |
: |
99% |
99% |
Rated Output |
: |
12 MVA |
12 MVA |
TRANSMISSION LINE AND GRID CONNECTION |
|
Length |
: |
39 km, to Lamane s/s at Tingla |
39 km, to Lamane s/s at Tingla |
Voltage |
: |
132 kV, Single Circuit |
132 kV, Single Circuit |
CONSTRUCTION PERIOD |
: |
3 Years |
3.5 Years |
|
|
|
|
|
|