Hongu Khola

Hongu Khola Hydropower Project

Background

Hongukhola Hydropower Project is PROR Hydro Project located in Solukhumbu district, The Feasibility  Study of Hongu Khola HEP on PROR is going on. The overall Sailent features of the project is listed below.
Project Type RoR PRoR
PROJECT LOCATION
Location  
  Region : Eastern Eastern
  Province No. : One One
  District : Solukhumbu Solukhumbu
  Rural Municipality : Chheskam VDC (Now, Mahakulung Rural Municipality) Chheskam VDC (Now, Mahakulung Rural Municipality)
Project Boundary  
  East : 86°52’53″E 86°52’53″E
  West : 86°54’31″E 86°54’31″E
  South : 27°32’08″N 27°32’08″N
  North : 27°34’40″N 27°34’40″N
GENEARL  
River : Hongu Hongu
Nearest Town : Salleri Salleri
Type of Scheme : Run-of-River Peaking Run-of-River
Highest Regulated Water Level :   1966 masl
Lowest Regulated Water Level :   1961 masl
Peaking Period :   1-hour morning and 1-hour evening
Reservoir Volume :   46,442 m3
Dead Storage Volume :   10,600 m3
Live Storage Volume :   32,000 m3
Gross Head : 310 m 314 m
Rated Net Head : 294 m 294 m
HYDROLOGY  
Catchment Area : 321.5 km2 321.5 km2
Design Discharge : 11.71 m3/s 11.71 m3/s
Minimum Downstream Release : 0.397 m3/s 0.397 m3/s
POWER AND ENERGY CALCULATIONS  
Installed Capacity (MW) : 28.9 MW 28.9 MW
Total Saleable Energy : 167.43 GWh 167.43 GWh
  Dry Energy : 31.49 GWh 51.85 GWh
  Wet Energy : 135.94 GWh 115.58 GWh
DIVERSION TUNNEL  
Type   : Unlined Unlined
Length   : 84 m 84 m
Size (B x H)   : 3 m x 3 m 3 m x 3 m
Slope : 0.097 0.097
DIVERSION WEIR  
Type : Ogee shaped Concrete Gravity Dam Ogee shaped Concrete Gravity Dam with free overflow spillway
Dam Length : 15.2 m 20.2 m
Dam Height (from river bed) : 7.0 m 13.0 m
UNDERSLUICE  
Size (B x H) : 5 m x 2.5 m 5 m x 3 m
No. of Gates : 1 2
INTAKE  
Type : Side Intake with submerged orifice Side Intake with submerged orifice
Size of Intake Opening (B x H) : 4.0 m x 2.4 m 4.0 m x 2.4 m
No. of Openings : 2 2
Velocity of Flow at Intake Trash-rack : 0.6 m/s 0.6 m/s
Trash-rack Cleaner : Manual by raking Manual by raking
GRAVEL TRAP  
Average Length : 7.6 m 7.6 m
Size (B x H) : 2.7 x 3.0 m 2.7 x 3.0 m
GRAVEL TRAP FLUSHING CULVERT  
Length : 13.0 m 13.0 m
Size (B x H) : 1.3 x 1.3 m 1.3 x 1.3 m
APPROCH TUNNEL      
Type : Inverted D-shaped unlined and partially concrete lined tunnel Inverted D-shaped unlined and partially concrete lined tunnel
Depth : 3.5 m 3.5 m
Width : 3.5 m 3.5 m
Bed Slope : 1 in 200 1 in 200
Length : 255 m 255 m
BRANCH TUNNEL (TO SETTLING BASIN)  
Type : Inverted D Shaped Concrete Lined Inverted D Shaped Concrete Lined
Length : 92 m (46 m each) 92 m (46 m each)
Size : 2.5 m x 2.5 m 2.5 m x 2.5 m
SETTLING BASIN  
Type : Hopper shaped underground with mechanized flushing Hopper shaped underground with mechanized flushing
Sediment Size to be Settled : 90% of 0.2 mm 90% of 0.2 mm
No. of Bays : 2 2
Length : 100 m 100 m
Width of uniform section : 8.0 m 8.0 m
Depth of uniform section (spring line to hopper top) : 5.7 m 5.7 m
Depth of hopper : 2.2 m 2.2 m
LINK TUNNEL (SETTLING BASIN TO HRT)  
Type : Inverted D Shaped Concrete Lined Inverted D Shaped Concrete Lined
Length : 82 m (41 m each) 91 m (45.5 m each)
Size : 2.5 m x 2.5 m 2.5 m x 2.5 m
ADIT/ACCESS/FLUSHING TUNNEL  
Total Length : 417 m 487m
Size : Various Various
HEADRACE TUNNEL  
Type : Low Pressure Tunnel Low Pressure Tunnel
Total Length (starting from link tunnel) : 2 890 m 2 890 m
Excavated size of Tunnel (B x H) : 3.5 m x 3.5 m 3.5 m x 3.5 m
Shape : Inverted D-shaped Inverted D-shaped
SURGE SHAFT  
Type : Simple, Vertical Shaft Underground, RCC Lined Restricted Orifice Type or Steel Pipe
Finished Diameter : 6.0 m 6.0 m
Upsurge Level : 1 968.7 masl 1 974.7 masl
Down-surge Level : 1 947.3 masl 1 947.3 masl
Top of surge shaft : 1 985.0 masl 1 979.0 masl
Total Height : 45 m 36.5 m
HEADRACE PIPE  
Material :   MS Pipe
Length (including embedded in HRT) :   245 m
Diameter :   2.5 m
PENSTOK PIPE  
Surface Pipe : 662 m length, 2.0 m dia. 570 m length, 2.0 m dia.
Diameter of penstock : 2 000 mm before branching 2 000 mm before branching
Vertical Shaft with penstock : 141 m length, excavated dia 3.2 m. 141 m length, excavated dia 3.2 m.
Inclined Shaft with penstock : 167 m length, excavated width 3.0 m 167 m length, excavated width 3.0 m
Penstock on Surface : 22 m length 22 m length
Branch pipe : 77 m (dia 1.3 m and 0.9 m) 77 m (dia 1.3 m and 0.9 m)
Thickness : 8 mm to 30 mm 8 mm to 30 mm
Material : Mild steel Mild steel
POWERHOSUE  
Type : Semi-surface Semi-surface
Size (L x B x H) : 38 m x 17 m x 17 m 38 m x 17 m x 17 m
TAILRACE CULVERT  
Type : RCC box culvert RCC box culvert
Length : 25 m 25 m
Size (B x H) : varies varies
TURBINE  
Type : Pelton, 4 jets Pelton, 4 jets
No. of Units : 2 2
Rated output : 15 000 kW 15 000 kW
Max. Efficiency : 90.50% 90.50%
Speed : 428.6 RPM 428.6 RPM
GENERATOR  
No. of Units : 2 2
Efficiency : 98% 98%
Generation voltage : 11 kV 11 kV
Rated output : 18 MVA 18 MVA
Frequency : 50 Hz 50 Hz
Transformer      
No. of Units : 3 +1 spares 3 +1 spares
Efficiency : 99% 99%
Rated Output : 12 MVA 12 MVA
TRANSMISSION LINE AND GRID CONNECTION  
Length : 39 km, to Lamane s/s at Tingla 39 km, to Lamane s/s at Tingla
Voltage : 132 kV, Single Circuit 132 kV, Single Circuit
CONSTRUCTION PERIOD : 3 Years 3.5 Years
   
Table II: Summary of Monthly Energy (Based on Daily Energy Calculation)
Months No. of Days River Discharge [m³/s] Riparian Discharge [m³/s] Diverted Discharge [m³/s] Net Head [m] Power [MW] Energy [GWh] Net Energy [GWh]
January 31 4.94 0.397 4.54 307.59 11.72 8.72 8.63
February 28 4.21 0.397 3.82 308.3 9.87 6.87 6.8
March 31 3.98 0.397 3.58 308.51 9.26 6.89 6.82
April 30 4.36 0.397 3.96 308.16 10.23 7.37 7.15
May 31 6.55 0.397 6.15 305.4 15.75 11.72 11.13
June 30 18.01 0.397 11.71 295.73 27.19 19.58 18.6
July 31 47.13 0.397 11.71 294 28.89 21.49 20.42
August 31 58.3 0.397 11.71 294 28.89 21.49 20.42
September 30 42.62 0.397 11.71 294 28.89 20.8 19.76
October 31 20.56 0.397 11.71 294 28.89 21.49 20.42
November 30 9.8 0.397 9.4 299.71 23.34 16.8 15.96
December 31 6.52 0.397 6.12 305.57 15.69 11.67 11.32
Average 18.91       Total 174.89 167.43
 
Wet Energy (GWh) 115.58 69%
Dry Energy (GWh) 51.85 31%